Client Name: Cardiff Netball Club

Location: Myall Road CARDIFF

Project Overview:
Complete occupational safety requirements – including documentation
Set up safety signage - as necessary
Profile failed sections to a depth of 50mm on second court – Approx. 72m2
Dispose of spoil to an approved waste disposal site
Excavate to a depth of 200mm to area around tree on second court – Approx. 50m2
Remove and dispose tree roots penetrating into court area – Approx. 50m2
Supply and lay 200mm of stabilised road base to section near tree on second court – Approx. 50m2
Roll & compact
Sweep area clean of loose material
Supply & spray tack coat of emulsion
Supply & lay 50mm of asphaltic concrete (AC7) to failed sections on second court – Approx. 72m2
Supply & lay 30mm of asphaltic concrete (AC7) to all court surfaces – Approx. 3740m2
Lay surface with sonic metering to ensure level surface
Roll & compact
Clean & tidy area

Square Meter: 4034m2

Completion Status: Completed In 1 Day