In-situ stabilisation and gravel road solutions for New England councils, with North Star Road already delivered.
New England is proof that distance matters less for a stabilisation crew than for almost any other pavement contractor.
The plant is self-contained, the material is already in the road, and the crew works the job through rather than commuting to it.
Accurate delivered North Star Road for Gwydir Shire Council this way: 14,400 square metres of part-service in-situ stabilisation, completed ahead of schedule. For councils a long way from the coast, a contractor that has already travelled to deliver work in the region, and can show it, is a different proposition from one promising to.
Cost efficiency
In-situ stabilisation reuses the material already in the ground, so there is no new material to import and no spoil to cart away. Less transport, less handling and a single mobilisation of plant make it a faster, more cost-effective way to rebuild a road.
More transport. Higher costs. Longer program.

New gravel carted in from the quarry, load by load.

The old pavement dug out and trucked away as spoil.

Extra trucks, excavators and crew on site for longer.

Haulage, tipping and program time all add to the price.
Less movement. A smarter solution.

Stabilise on site, with nothing imported and nothing carted away.
Fewer truck movements, less haulage and less disruption to traffic.
One pass of the recycler, compacted and back under traffic sooner.
Local experience
The region's roads cross reactive clay country where the ground swells and shrinks with the seasons, and long unsealed networks carry real freight between properties and silos. Both are exactly what stabilisation is for: binding the existing material into a layer that holds its strength when the moisture changes. On North Star Road the answer was a 70/30 slag/lime blend at 200mm. The binder and depth follow what's actually in the ground, set by testing rather than by template.
What we deliver
Accreditations & approvals
Accurate is prequalified, certified and industry recognised, so the compliance gate is cleared before price is considered.
Same standards. Every project. Large or small.
Prequalifications, approvals & industry recognition
Access to more opportunities. Delivered locally.

Eligible for major state and regional works across NSW.

Pre-approved to work with NSW councils across the Hunter, Central Coast and Mid North Coast.
The panel behind most NSW council road work.

Committed to best practice in pavement recycling and stabilisation.
Industry leadership in pavement recycling.

Supporting a stronger, more sustainable pavement industry in Australia.
A safer, more resilient road network.
Independently certified management systems
People / Environment / Safety. Built into everything we do.
Quality management
Rigorous quality frameworks ensuring top council and client compliance.

Environmental management
Eco-minded operations reducing environmental impact.

OHS safety management
Zero-harm site standards protecting our crews, clients and the community.

Featured projects

A trusted regional partner
Gwydir Shire Council is a named Accurate client. Engagement through Local Government Procurement for works within the panel's scope, or by tender to quotes@accuratestabilising.com.au.
Gwydir Shire Council is a named client. North Star Road was delivered ahead of schedule.
TfNSW prequalified. ISO certified. LGP approved.
Roads rebuilt stronger from what is already there.
FAQs / New England
It strengthens a road by mixing binders into the existing pavement material in place, rather than digging it out and replacing it. The result is a stronger, longer-lasting pavement built from the material already on site.
When the material in the road is worth reusing. Test pits or cores establish what is there; if the failure is in strength or moisture rather than missing material, stabilisation rebuilds the road in place.
Yes. Accurate is a Local Government Procurement approved contractor and is Transport for NSW prequalified across Z1, A2, R2 and F2.
Far less time than dig-out reconstruction. The recycler works the road in place, compaction follows the same day, and the road carries traffic again sooner.
Yes. The plant is self-contained, the material is already in the road, and the crew works the job through rather than commuting to it. North Star Road for Gwydir Shire was delivered this way.
REGION ENQUIRY
Call (02) 4942 6100 or send the road and the problem.