Stronger local roads, built from the material already in them. In-situ stabilisation, rehabilitation and surfacing across Port Stephens.
Accurate's depot at Redhead is about an hour from Nelson Bay and forty minutes from Raymond Terrace.
A stabilisation crew mobilises the same morning with everything it needs, stabiliser, spreader, water cart, rollers and operators, because the material for the job is already in the road.
That's the practical difference between stabilisation and almost any other pavement method. There's no quarry to schedule, no tip to book, no convoy of tippers through Nelson Bay Road. The plant arrives, does the work, and leaves. A street that would take a dig-out contractor two weeks takes days.
Accurate has completed work for Port Stephens Council and is an approved contractor through Local Government Procurement. The business has operated from the Hunter since 2001 and runs a regional office at Anna Bay alongside the Newcastle head office.
Cost efficiency
In-situ stabilisation reuses the material already in the ground, so there is no new material to import and no spoil to cart away. Less transport, less handling and a single mobilisation of plant make it a faster, more cost-effective way to rebuild a road.
More transport. Higher costs. Longer program.

New gravel carted in from the quarry, load by load.

The old pavement dug out and trucked away as spoil.

Extra trucks, excavators and crew on site for longer.

Haulage, tipping and program time all add to the price.
Less movement. A smarter solution.

Stabilise on site, with nothing imported and nothing carted away.
Fewer truck movements, less haulage and less disruption to traffic.
One pass of the recycler, compacted and back under traffic sooner.
Local experience
Port Stephens pavements sit on some of the most variable ground in the Hunter. The Tomaree peninsula is largely sand over rock, with a high water table in the low-lying areas around Salt Ash, Bobs Farm and the Tilligerry. That ground saturates in a wet season and softens under a pavement that was never designed for it. Further west toward Raymond Terrace and Medowie, the soils shift to clay and alluvium along the Williams and Hunter floodplains. For stabilisation, that means two things. On the sandy coastal ground, cement or slag/lime binders give a granular base the cohesion it lacks. On the clay and alluvial ground inland, lime treatment of the subgrade usually comes first, to dry it and de-plasticise it, before the base is bound above. The crews know the area. The method is set by what's actually in the ground, not by a template.
What we deliver

A trusted regional partner
Accurate is a named contractor for Port Stephens Council and holds Local Government Procurement approval, through which the council can engage without a separate tender for works within the panel's scope.
A named contractor for Port Stephens Council, engaged through Local Government Procurement.
TfNSW prequalified. ISO certified. LGP approved.
Roads rebuilt stronger from what is already there.
Accreditations & approvals
Accurate is prequalified, certified and industry recognised, so the compliance gate is cleared before price is considered.
Same standards. Every project. Large or small.
Prequalifications, approvals & industry recognition
Access to more opportunities. Delivered locally.

Eligible for major state and regional works across NSW.

Pre-approved to work with NSW councils across the Hunter, Central Coast and Mid North Coast.
The panel behind most NSW council road work.

Committed to best practice in pavement recycling and stabilisation.
Industry leadership in pavement recycling.

Supporting a stronger, more sustainable pavement industry in Australia.
A safer, more resilient road network.
Independently certified management systems
People / Environment / Safety. Built into everything we do.
Quality management
Rigorous quality frameworks ensuring top council and client compliance.

Environmental management
Eco-minded operations reducing environmental impact.

OHS safety management
Zero-harm site standards protecting our crews, clients and the community.

FAQs / Port Stephens
It strengthens a road by mixing binders into the existing pavement material in place, rather than digging it out and replacing it. The result is a stronger, longer-lasting pavement built from the material already on site.
When the material in the road is worth reusing. Test pits or cores establish what is there; if the failure is in strength or moisture rather than missing material, stabilisation rebuilds the road in place.
Yes. Accurate is a Local Government Procurement approved contractor and is Transport for NSW prequalified across Z1, A2, R2 and F2.
Far less time than dig-out reconstruction. The recycler works the road in place, compaction follows the same day, and the road carries traffic again sooner.
About an hour from Redhead to Nelson Bay and forty minutes to Raymond Terrace. A crew mobilises the same morning with the stabiliser, spreader, water cart and rollers.