(02) 4942 6100Enquire
Part-service stabilisation works at Port Botany

Services / Integrated delivery

Civil and base construction

Delivered under Transport for NSW R2 road construction prequalification, with owned plant and the same cross-trained crews.

What it covers

The third capability.

In-situ stabilisation recycles what's there; asphalt finishes it; civil and base construction is everything in between and underneath: the earthworks and base placement that let Accurate take on a whole pavement rather than a single treatment.

What we self-perform

Excavation, base, subgrade and trim

  • Excavation and spoil disposalbox-out for new pavements, removal of failed or contaminated material, disposal to approved sites
  • Base supply, placement and compactionthe full range of road-base and gravel materials, supplied, placed, graded, watered and compacted to specification
  • Subgrade preparationtrim, proof-roll, and lime stabilisation where the ground needs it
  • Final trimgrader to design level and crossfall, base and subgrade
  • Base modificationincluding in-situ stabilisation of placed material where the design calls for a bound base

How we work with you

Full-service and part-service

Flexible ways to engage Accurate, depending on your project requirements.

Full-service

Everything required to build the pavement from start to finish, self-delivered and handed over complete.

  • Pre-milling, spreading, mixing
  • Compaction, trimming and rolling
  • Seal coat or asphalt
  • One contract, one site supervisor

Part-service

Plant and crew for the stabilisation step itself, working to your programme with your own resources alongside.

  • Stabiliser, spreader truck and water cart
  • Operators who know the plant
  • Your compaction, trimming and surfacing
  • The specialist step, on your dates
Stabilisation works at Sublime Point

Why it's in-house

Accurate does both

A stabilisation contractor who can't do the civil has to subcontract it, which means another mobilisation, another set of paperwork, and a handover at the point where the base meets the stabilised layer.

  • Whole-of-pavement scopes

    It's what lets the business take on whole-of-pavement scopes.

  • More work inside one team

    Keep more of the work inside one team.

  • One point of accountability

    One point of accountability from box-out to seal.

Enquiries, tender requests or specifications

Enquire about your next civil and base construction project

Call (02) 4942 6100 or send the road and the problem.

Contact Info