(02) 4942 6100Enquire
Part-service stabilisation works at Port Botany

Services / Integrated delivery

Civil and base construction

Delivered under Transport for NSW R2 road construction prequalification, with owned plant and the same cross-trained crews.

What it covers

The third capability.

In-situ stabilisation recycles what's there; asphalt finishes it; civil and base construction is everything in between and underneath: the earthworks and base placement that let Accurate take on a whole pavement rather than a single treatment.

What we self-perform

Excavation, base, subgrade and trim

  • Excavation and spoil disposalbox-out for new pavements, removal of failed or contaminated material, disposal to approved sites
  • Base supply, placement and compactionthe full range of road-base and gravel materials, supplied, placed, graded, watered and compacted to specification
  • Subgrade preparationtrim, proof-roll, and lime stabilisation where the ground needs it
  • Final trimgrader to design level and crossfall, base and subgrade
  • Base modificationincluding in-situ stabilisation of placed material where the design calls for a bound base

How we work with you

Full-service and part-service

Flexible ways to engage Accurate, depending on your project requirements.

Full-service

Everything required to build the pavement from start to finish, self-delivered and handed over complete.

  • Pre-milling, spreading, mixing
  • Compaction, trimming and rolling
  • Seal coat or asphalt
  • One contract, one site supervisor

Part-service

Plant and crew for the stabilisation step itself, working to your programme with your own resources alongside.

  • Stabiliser, spreader truck and water cart
  • Operators who know the plant
  • Your compaction, trimming and surfacing
  • The specialist step, on your dates
Stabilisation works at Sublime Point

Why it's in-house

Accurate does both

A stabilisation contractor who can't do the civil has to subcontract it, which means another mobilisation, another set of paperwork, and a handover at the point where the base meets the stabilised layer.

  • Whole-of-pavement scopes

    It's what lets the business take on whole-of-pavement scopes.

  • More work inside one team

    Keep more of the work inside one team.

  • One point of accountability

    One point of accountability from box-out to seal.

Enquiries, tender requests or specifications

Enquire about your next civil and base construction project

Call (02) 4942 6100 or send the road and the problem.

Contact Info

We use your details to answer your enquiry. See our privacy policy.