What is Stabilisation

In situ stabilisation is a popular method of road pavement rehabilitation.

It is usually more economical to recycle and improve the quality of in situ materials within an existing pavement rather than using new material. Stabilisation is normally adopted to improve the strength and durability of pavements on roads, highways, runways and many other applications and reduce the moisture sensitivity of poor quality materials.

Accurate Stabilising are highly specialised and experienced contractors with an understanding of the various binder applications suitable for each individual project in order to achieve the desired results.

The process of stabilising has many benefits which include;

  • The ability to recycle and reuse existing pavement materials
  • Less disruption to traffic
  • Minimal or no requirement for site excavation and costs associated with it
  • Cost of new quarried materials reduced or not required depending on application
  • Landfill tip sites costs reduced
  • Less or no haulage costs for transporting unsuitable material away and carting new material in
  • Drying wet soils to allow construction/remediation activities to continue
  • Completion time of project reduced
  • A stabilised pavement will require less financial outlay and less future maintenance than a conventional unmodified pavement.
  • Environmentally friendly construction.
  • Reduction in permeability and increased pavement serviceability in wet conditions.

Cost efficiency

Same ground. Lower costs.

In-situ stabilisation reuses the material already in the ground, so there is no new material to import and no spoil to cart away. Less transport, less handling and a single mobilisation of plant make it a faster, more cost-effective way to rebuild a road.

Traditional approach

More transport. Higher costs. Longer program.

  • Import material

    New gravel carted in from the quarry, load by load.

  • Export waste

    The old pavement dug out and trucked away as spoil.

  • More plant and labour

    Extra trucks, excavators and crew on site for longer.

  • Increased costs

    Haulage, tipping and program time all add to the price.

In-situ stabilisation

Less movement. A smarter solution.

Wirtgen WR 2400 recycler reworking the existing pavement in place
  • Reuse existing material

    Stabilise on site, with nothing imported and nothing carted away.

  • Lower transport costs

    Fewer truck movements, less haulage and less disruption to traffic.

  • Faster delivery

    One pass of the recycler, compacted and back under traffic sooner.

ENQUIRIES, TENDER REQUESTS OR SPECIFICATIONS

ENQUIRE ABOUT YOUR NEXT IN-SITU ROAD STABILISATION PROJECT

Request a tender pack, get a quote, or talk to our team about your stabilisation requirements.

Contact Info

We use your details to answer your enquiry. See our privacy policy.