Full-service
Everything required to build the pavement from start to finish, self-delivered and handed over complete.
- Pre-milling, spreading, mixing
- Compaction, trimming and rolling
- Seal coat or asphalt
- One contract, one site supervisor

Services / Pavement works
The shoulder is the edge of the road, and it fails first.
It carries the wheel path of every vehicle that pulls over, every truck that drifts wide, and every drop of water that runs off the crown.
On most rural and regional roads it was built lighter than the running lanes to begin with.
Shoulder stabilisation strengthens it. The existing shoulder material is stabilised in place, usually with a lime or slag/lime binder, to a strength that holds an edge, resists rutting, and stops water getting under the pavement from the side. Where the road is being widened, the same process builds the new shoulder into a proper structural extension of the pavement rather than a strip of loose gravel beside it.
When councils and TfNSW specify it
Best suited for
How we work with you
Flexible ways to engage Accurate, depending on your project requirements.
Everything required to build the pavement from start to finish, self-delivered and handed over complete.
Plant and crew for the stabilisation step itself, working to your programme with your own resources alongside.
FAQs
Narrow-width work is its own discipline. The stabiliser runs the shoulder in a single pass at 150–300mm; binder is spread ahead of it; a smaller roller compacts it; the grader trims the crossfall to drain outward. It's usually done under a lane closure with traffic control rather than a full road closure, so the running lanes stay open. Accurate's crews and plant are set up for it, and it's a natural addition to a rehabilitation contract on the same road: one mobilisation, both scopes.
Related links
Enquiries, tender requests or specifications
Call (02) 4942 6100 or send the road and the problem.
Contact Info