Full-service
Everything required to build the pavement from start to finish, self-delivered and handed over complete.
- Pre-milling, spreading, mixing
- Compaction, trimming and rolling
- Seal coat or asphalt
- One contract, one site supervisor

Services / Pavement works
When a section of road has failed completely, rutted through, potholing repeatedly, base pumping up through the surface, a shallow patch won't hold.
The failure is 300mm down, and the fix has to go there too.
Heavy patching rebuilds the failed section to full depth. Deep-lift heavy patching does it in place: the failed pavement is pulverised and stabilised to 300mm or more in a single lift, with a binder blend strong enough to carry the load, then trimmed, compacted and sealed. There's no dig-out, no cart-away and no imported base.
It's the maintenance line item councils and Transport for NSW use to deal with the worst sections of a road without rehabilitating the whole length. Done properly, the patch outlasts the pavement around it.
The process
A section can usually be closed, patched and reopened within a day or two.
The failure is usually wider underground than on the surface.
Needed where the seal is too thick to mix through.
Typically a strong slag/lime or cement blend at 4–5% for a heavily bound patch.
Padfoot roller first, then smooth-drum, and trim to match the surrounding pavement.
Prime and two-coat seal, or asphalt to match the existing surface.
Best suited for
How we work with you
Flexible ways to engage Accurate, depending on your project requirements.
Everything required to build the pavement from start to finish, self-delivered and handed over complete.
Plant and crew for the stabilisation step itself, working to your programme with your own resources alongside.
Cost efficiency
In-situ stabilisation reuses the material already in the ground, so there is no new material to import and no spoil to cart away. Less transport, less handling and a single mobilisation of plant make it a faster, more cost-effective way to rebuild a road.
More transport. Higher costs. Longer program.

New gravel carted in from the quarry, load by load.

The old pavement dug out and trucked away as spoil.

Extra trucks, excavators and crew on site for longer.

Haulage, tipping and program time all add to the price.
Less movement. A smarter solution.

Stabilise on site, with nothing imported and nothing carted away.
Fewer truck movements, less haulage and less disruption to traffic.
One pass of the recycler, compacted and back under traffic sooner.
Experience
FAQs
A patch that only treats the top 100–150mm sits on the same failed base that caused the problem. It looks fixed. It fails again, usually within a year, and the second repair costs more than the first because now there's a patch to remove as well. Going to 300mm+ gets below the failure. Doing it in one lift, rather than layering, means the whole depth is bound as one structural layer, with no weak plane between courses. It takes a stabiliser with the power to mix 300mm+ of pavement in a pass. Accurate's deepest work on record is 350mm.