(02) 4942 6100Enquire
Prepared road surface through bushland, tree shadows across the foreground, Stuarts Point

Project case study

Stuarts Point - EIRE

  • In-Situ Stabilisation
  • Mid North Coast
  • Civil contractors
Location
Stuarts Point
Client
EIRE
Region
Mid North Coast
Service
In-Situ Stabilisation
Grader working on the pavement past caravan sites and parked trucks, Stuarts Point
Stuarts Point
  • Graded pavement with tyre tread marks, worker and grader in the distance, Stuarts Point
  • Grader working on the pavement past caravan sites and parked trucks, Stuarts Point
  • Mixed pavement material with deep tyre tread beside a new concrete kerb, Stuarts Point
  • Trimmed road surface with kerb, branded utes parked on the verge, Stuarts Point
  • Finished road surface between the river bank and parked utes, Stuarts Point
  • Stabiliser machine working along a curved section of road in the park, Stuarts Point
  • Finished road surface at a junction with cabins and palms either side, Stuarts Point
  • Curved finished road beside the river with construction site signage, Stuarts Point
  • Finished road surface running through the caravan park toward the river, Stuarts Point
  • Finished road with site fencing, cones and barriers at the far end, Stuarts Point
  • Curved finished road beside site fencing, bunting and a cabin, Stuarts Point