Mid North Coast
In-situ stabilisation on the Mid North Coast
Accurate Stabilising delivers full-service and part-service in-situ stabilisation across the MidCoast LGA: Taree, Forster, Tuncurry, Gloucester, Krambach, Wingham, Old Bar, Hallidays Point and the surrounding rural network, with crews mobilising from Redhead.
Full-service: pre-milling, binder spreading, mixing to 200–350mm, water, compaction, trimming, and seal or asphalt. The local example is The Bucketts Way at Krambach, in-situ stabilisation with spray seal surfacing.
Part-service: stabiliser, spreader and water cart with operators, on your programme.
Binders for Mid North Coast ground: cement or slag/lime for the sandy coastal pavements; lime for the Manning floodplain clays; polymer for the unsealed network inland.
Completed locally: The Bucketts Way, Krambach.
