ISO 9001
Quality management
Rigorous quality frameworks ensuring top council and client compliance.


Sectors / Government and state infrastructure
Accurate Stabilising holds Transport for NSW prequalification across four classes: Z1 full-service in-situ stabilisation, A2 asphalt, R2 road construction and F2 financial.
Transport for NSW
Prequalified with Transport for NSW since 2014, Accurate delivers stabilisation on state roads and major projects, directly and as a specialist subcontractor to head contractors. The same registrations, systems and owned plant answer what NSW Public Works and council-procured pavement programmes ask for, including flood and disaster recovery work.
Some of the authorities we work with
Together they mean eligibility across the full scope of state pavement work.
Z1 is the top-tier stabilisation registration and is held by a small number of contractors in NSW. Accurate has been prequalified with RMS, now Transport for NSW, since 2014.
This page is for the TfNSW project manager, the tier-one head contractor's procurement lead, and anyone scoping stabilisation on a state road or major infrastructure project.
This is the project that put Accurate on the state map.
Two sections of the New England Highway near Murrurundi, 40,800m² in total, for Roads and Maritime Services. Full-service in-situ stabilisation to a heavily bound standard of UCS above 4 MPa, meeting the R75 ride requirements.
The programme was six weeks. Accurate pre-milled the pavement with a 120-tonne surface miner, the first time the method had been used in the industry, and delivered it in about two. On a live highway, that's four fewer weeks of traffic management, lane closures and disruption. Contract value: $1.3 million.
It's the job that shows what the Z1 registration means in practice: the plant, the method, the specification, and the programme, on a state road.
Accurate held a position on the RMS four-year panel as the only private company.

On major projects
On major projects, Accurate works as a specialist stabilisation subcontractor to tier-one and tier-two head contractors, bringing the Z1 registration, the owned plant and the crews to a scope the head contractor doesn't self-perform.
The top-tier stabilisation registration.
Stabilisers, spreaders, water carts and rollers.
ISO 9001, 14001 and 45001, Cm3 and BNG Conserve.
What we deliver
Four prequalification classes cover the full scope of state pavement work: stabilisation, asphalt, road construction and the financial threshold behind them.
Accreditations & approvals
Transport for NSW prequalification across four classes: Z1 full-service in-situ stabilisation, A2 asphalt, R2 road construction and F2 financial. Z1 is the top-tier stabilisation registration, held by a small number of contractors in NSW, and Accurate has been prequalified with RMS, now Transport for NSW, since 2014.
Same standards. Every project. Large or small.
Prequalifications, approvals & industry recognition
Access to more opportunities. Delivered locally.

Eligible for major state and regional works across NSW.

Pre-approved to work with NSW councils across the Hunter, Central Coast and Mid North Coast.
The panel behind most NSW council road work.

Committed to best practice in pavement recycling and stabilisation.
Industry leadership in pavement recycling.

Supporting a stronger, more sustainable pavement industry in Australia.
A safer, more resilient road network.
Independently certified management systems
People / Environment / Safety. Built into everything we do.
Quality management
Rigorous quality frameworks ensuring top council and client compliance.

Environmental management
Eco-minded operations reducing environmental impact.

OHS safety management
Zero-harm site standards protecting our crews, clients and the community.

Local presence
Forward demand for state pavement work in the Hunter, Central Coast and Mid North Coast is funded and visible: the Central Coast Roads Package, betterment and resilience upgrades across the Hunter, and the civil and access works from the Hunter–Central Coast Renewable Energy Zone. For a prequalified regional contractor with plant an hour away, that's work within reach.
Cost efficiency
In-situ stabilisation reuses the material already in the ground, so there is no new material to import and no spoil to cart away. Less transport, less handling and a single mobilisation of plant make it a faster, more cost-effective way to rebuild a road.
More transport. Higher costs. Longer program.

New gravel carted in from the quarry, load by load.

The old pavement dug out and trucked away as spoil.

Extra trucks, excavators and crew on site for longer.

Haulage, tipping and program time all add to the price.
Less movement. A smarter solution.

Stabilise on site, with nothing imported and nothing carted away.
Fewer truck movements, less haulage and less disruption to traffic.
One pass of the recycler, compacted and back under traffic sooner.
Recent projects
How to engage
Z1, A2, R2 and F2 prequalification covers the full scope of state pavement work. Current prequalifications, certificates and capability statements are supplied on request.
On major projects, Accurate works as a specialist stabilisation subcontractor to tier-one and tier-two head contractors, part-service or full-service.
Send the tender documents to quotes@accuratestabilising.com.au. Tender packs including current certificates, insurances and management plans are supplied on request.
Same roads. Stronger tomorrow.
Enquiries, tender requests or specifications
Current prequalifications, certificates and capability statements supplied on request.